50 Prescott Electrical Shutdown Equipment Recommendations

Prepare equipment prior to shutdown of all electrical power at Gateway Park II.

Why

Upgrades to the electrical supply for Gateway II at 50 Prescott Street require a power shutdown. To protect from power surges, IT recommends office equipment be powered off prior to the shutdown.

Impact

  • All devices on stand-by or generator power will be maintained.
  • All other equipment will not have power.

Action Needed

Please shutdown office equipment (computers, printers, copiers, projectors, etc.). Using a surge protector is recommended wherever possible. In the absence of a surge protector, the equipment should be unplugged from the power source.


Timeline

End: 4 May 2019, 4:00 PM

Start: 4 May 2019, 7:00 AM

Posted: 2 May 2019, 10:00 AM

Status

Completed


Timing

From

Saturday

4 May 2019

7:00 AM

To

Saturday

4 May 2019

4:00 PM

Posted

2 May 2019, 10:00 AM